[{"data":1,"prerenderedAt":441},["ShallowReactive",2],{"navigation_docs":3,"-livrable-exemple":31,"-livrable-exemple-surround":440},[4],{"title":5,"path":6,"stem":7,"children":8},"Blog","\u002Fblog","blog",[9,11,15,19,23,27],{"title":5,"path":6,"stem":10},"blog\u002Findex",{"title":12,"path":13,"stem":14},"Un DSA, en temps réel (Dossier de Suivi d'Atelier)","\u002Fblog\u002Fdsa-en-temps-reel","blog\u002Fdsa-en-temps-reel",{"title":16,"path":17,"stem":18},"NF ISO 19443 vs NT 85-114 : les écarts en clair","\u002Fblog\u002Fiso19443-vs-nt85-114","blog\u002Fiso19443-vs-nt85-114",{"title":20,"path":21,"stem":22},"Le site nucléaire Iter, 13 soudeurs non-certifiés — une situation explosive","\u002Fblog\u002Fiter-13-soudeurs-non-certifies","blog\u002Fiter-13-soudeurs-non-certifies",{"title":24,"path":25,"stem":26},"Vérifier un dossier d'intervention conforme à la NT 85-114 : pourquoi tout dépend de la qualité des données en entrée","\u002Fblog\u002Fnt85-114-qualite-donnees","blog\u002Fnt85-114-qualite-donnees",{"title":28,"path":29,"stem":30},"Rapport de Fin d'Intervention (RFI), un défi !","\u002Fblog\u002Frfi-un-defi","blog\u002Frfi-un-defi",{"id":32,"title":33,"body":34,"description":431,"extension":432,"links":433,"meta":434,"navigation":435,"path":436,"seo":437,"stem":438,"__hash__":439},"docs\u002Flivrable-exemple.md","Exemple de rapport de revue",{"type":35,"value":36,"toc":420},"minimark",[37,42,80,85,141,147,151,238,242,323,340,344,403,406,409],[38,39,41],"h2",{"id":40},"rapport-de-revue-documentaire-lot-de-commande-ct-2026-0148","Rapport de revue documentaire — Lot de commande CT-2026-0148",[43,44,45,49,50,53,56,57,59,62,63,68,70,73,74,76,79],"p",{},[46,47,48],"strong",{},"Client"," : Fabricant d'équipements (classe N2) — non nommé",[51,52],"br",{},[46,54,55],{},"Périmètre"," : 12 DSR et 4 RFF d'une commande de vannes centrifuges pour poste auxiliaire",[51,58],{},[46,60,61],{},"Référentiels appliqués"," : référentiel qualité client, NF ISO 19443, NF Z42-013 (documents numériques) — pour un exemple côté exploitation, voir le ",[64,65,67],"a",{"href":66},"\u002Flivrable-exemple-nt85-114","livrable d'exemple NT 85-114",[51,69],{},[46,71,72],{},"Date de revue"," : fictive — 14\u002F09\u002F2026",[51,75],{},[46,77,78],{},"Reviseur"," : Françoise Entzmann — energie.qdoc",[81,82,84],"h3",{"id":83},"synthèse","Synthèse",[86,87,88,104],"table",{},[89,90,91],"thead",{},[92,93,94,98,101],"tr",{},[95,96,97],"th",{},"Criticité",[95,99,100],{},"Nombre",[95,102,103],{},"Exemples",[105,106,107,119,130],"tbody",{},[92,108,109,113,116],{},[110,111,112],"td",{},"Écart critique",[110,114,115],{},"3",[110,117,118],{},"Absence de signature d'approbation sur 1 DSR ; point d'arrêt franchi sans trace de présence du surveillant client ; date de contrôle CND postérieure au rapport d'essais qu'il référence",[92,120,121,124,127],{},[110,122,123],{},"Écart majeur",[110,125,126],{},"7",[110,128,129],{},"Traçabilité matières incomplète sur 2 lots de fournitures ; qualifications soudeurs expirées au moment des opérations ; versions de plan non justifiées",[92,131,132,135,138],{},[110,133,134],{},"Écart mineur",[110,136,137],{},"11",[110,139,140],{},"Ratures sans paraphe ; références de documents non à jour ; horodatage GED non probant",[43,142,143,146],{},[46,144,145],{},"Verdict"," : 3 écarts critiques = remise du lot risquée en l'état. Recommandation : traitement des écarts critiques avant toute remise au donneur d'ordre.",[81,148,150],{"id":149},"score-par-axe","Score par axe",[86,152,153,169],{},[89,154,155],{},[92,156,157,160,163,166],{},[95,158,159],{},"Axe",[95,161,162],{},"Critères",[95,164,165],{},"Score de conformité",[95,167,168],{},"Observation",[105,170,171,185,198,211,225],{},[92,172,173,176,179,182],{},[110,174,175],{},"Complétude",[110,177,178],{},"8",[110,180,181],{},"75 %",[110,183,184],{},"LDA et CMTR présents ; 2 PV manquants sur un lot",[92,186,187,190,192,195],{},[110,188,189],{},"Cohérence",[110,191,178],{},[110,193,194],{},"63 %",[110,196,197],{},"Incohérences DSR \u002F rapports de contrôle sur 3 documents",[92,199,200,203,205,208],{},[110,201,202],{},"Traçabilité",[110,204,178],{},[110,206,207],{},"58 %",[110,209,210],{},"Chaîne complète reconstituable sur 5 lots sur 9",[92,212,213,216,219,222],{},[110,214,215],{},"Conformité contractuelle",[110,217,218],{},"6",[110,220,221],{},"50 %",[110,223,224],{},"PAQ approuvé, mais dérogations non signées",[92,226,227,230,232,235],{},[110,228,229],{},"Piliers Z42-013",[110,231,218],{},[110,233,234],{},"67 %",[110,236,237],{},"Horodatage GED non probant ; intégrité des PDF non contrôlée",[81,239,241],{"id":240},"extrait-de-la-grille-cotée","Extrait de la grille cotée",[86,243,244,265],{},[89,245,246],{},[92,247,248,251,253,256,259,262],{},[95,249,250],{},"#",[95,252,159],{},[95,254,255],{},"Document",[95,257,258],{},"Constat",[95,260,261],{},"Cotation",[95,263,264],{},"Preuve \u002F observation",[105,266,267,286,305],{},[92,268,269,272,274,277,280,283],{},[110,270,271],{},"04",[110,273,189],{},[110,275,276],{},"DSR-VN-014, p. 8 §3.2",[110,278,279],{},"Contrôle dimensionnel signé « RP » sans identification ni date",[110,281,282],{},"Em",[110,284,285],{},"Registre du personnel à joindre ; validation service qualité à faire valider",[92,287,288,291,293,296,299,302],{},[110,289,290],{},"02",[110,292,215],{},[110,294,295],{},"DSR-VN-017, §4.1, point d'arrêt PA-02",[110,297,298],{},"Franchissement du point d'arrêt sans attestation de présence du surveillant client",[110,300,301],{},"EM",[110,303,304],{},"Vérifier l'existence d'une PV d'intervention auprès du donneur d'ordre ; sinon écart ouvert avec décision formalisée",[92,306,307,310,312,315,318,320],{},[110,308,309],{},"03",[110,311,202],{},[110,313,314],{},"RFF-CT-0148, annexe C, QSE-009",[110,316,317],{},"Certificat de qualification d'un soudeur expiré 3 semaines avant l'opération soudée",[110,319,301],{},[110,321,322],{},"Vérifier la requalification ; à défaut, contrôle non destructif complémentaire sur le cordon",[43,324,325,326,329,330,332,333,335,336,339],{},"Cotations : ",[46,327,328],{},"C"," = conforme, ",[46,331,282],{}," = écart mineur, ",[46,334,301],{}," = écart critique, ",[46,337,338],{},"N\u002FA"," = non applicable. Chaque point de contrôle est accompagné de la référence exacte de l'exigence non satisfaite et de la localisation dans le document.",[81,341,343],{"id":342},"plan-daction-priorisé-extrait","Plan d'action priorisé (extrait)",[86,345,346,362],{},[89,347,348],{},[92,349,350,353,356,359],{},[95,351,352],{},"Priorité",[95,354,355],{},"Action",[95,357,358],{},"Responsabilité",[95,360,361],{},"Délai",[105,363,364,378,392],{},[92,365,366,369,372,375],{},[110,367,368],{},"1",[110,370,371],{},"Formaliser le traitement de l'écart PA-02 avec décision du donneur d'ordre",[110,373,374],{},"Service qualité client",[110,376,377],{},"1 semaine",[92,379,380,383,386,389],{},[110,381,382],{},"2",[110,384,385],{},"Requalifier ou contrôler par CND le cordon soudé concerné",[110,387,388],{},"Fabrication + CND",[110,390,391],{},"2 semaines",[92,393,394,396,399,401],{},[110,395,115],{},[110,397,398],{},"Compléter les identifications manquantes (registre du personnel)",[110,400,374],{},[110,402,377],{},[43,404,405],{},"Chaque écart majeur ou critique est assorti d'une recommandation corrective priorisée, à valider par vos équipes. Le suivi du plan d'action jusqu'à preuve de traitement (objectif pilote : ≥ 80 % des écarts traités avec preuve) est couvert par la formule « audit et accompagnement », qui débouche sur la fiche de clôture du lot : pour chaque écart, son statut (traité ou non) et la preuve associée.",[407,408],"hr",{},[43,410,411,414,415,419],{},[46,412,413],{},"Cet exemple montre la forme. Le fond, lui, sera vos documents."," ",[64,416,418],{"href":417},"mailto:info@arundo.tech","Contactez-moi"," pour un audit éclair sur 3 documents de votre choix.",{"title":421,"searchDepth":422,"depth":422,"links":423},"",2,[424],{"id":40,"depth":422,"text":41,"children":425},[426,428,429,430],{"id":83,"depth":427,"text":84},3,{"id":149,"depth":427,"text":150},{"id":240,"depth":427,"text":241},{"id":342,"depth":427,"text":343},"Exemple fictif mais réaliste — la forme exacte du livrable que vous recevez. Grille cotée, score par axe, plan d'action priorisé.","md",null,{},false,"\u002Flivrable-exemple",{"title":33,"description":431},"livrable-exemple","x0HkiwBDMvWZOumzKBgjfWr6oVkBf9lIUHM9reuQav0",[433,433],1791907537962]